Question: Risk management programs are designed to reduce risk to:
A.) a level that is too small to be measurable.
B.) the point at which the benefit exceeds the expense.
C.) a level that the organization is willing to accept.
D.) a rate of return that equals the current cost of capital.

Download pdf (with explanations) edition of this exam.